The Work

Full Kitchen Remodels in Naples

Layout, cabinetry, stone and permits on one written scope and one schedule.

We'll put you in touch with a local contractor.

Built for Naples

Full Kitchen Remodels in Naples: What the Work Involves

Many Naples kitchens still have a closed layout, a soffit and a peninsula where an island would fit. Opening them usually means moving plumbing or a wall, where the permit begins.

Collier County requires a permit to alter or replace any electrical, gas, mechanical or plumbing system, filed through Growth Management at 2800 North Horseshoe Drive. The plan accounts for that from the first drawing.

The measured plan comes first, then a written scope with every allowance, then a schedule in weeks. Owners away for the summer get weekly photos, and high-rise units follow the condo and HOA process.

Why Choose Us

Why Naples Homeowners Choose Us for Full Kitchen Remodels

Scope Before Demolition
Every allowance for cabinets, stone, tile and fixtures is written into the scope before the first wall opens.
Weeks, Not Guesses
Cabinet, stone and finish weeks are named on the schedule, and you hear first when a delivery moves.
Permits Handled
Electrical, plumbing and structural permits are filed with Collier County or the City of Naples as part of the job.
One Point of Contact
One person carries the plan, the selections and the weekly photo update from the first meeting to the walkthrough.
Materials & Specs

What We Use for Full Kitchen Remodels

Industry-standard materials and specifications you can rely on.

Cabinet Construction
Plywood or furniture-grade boxes with soft-close hardware, industry typical for custom and semi-custom lines
Countertop Materials
Quartz, quartzite, granite or porcelain slab, chosen by how the kitchen is used and the budget tier
Typical Timeline
About 4 to 6 weeks on site when the layout stays, 8 to 12 weeks for a full gut with a layout change, named in writing before work starts
Permit Scope
Electrical, plumbing and structural changes permitted through Collier County or the City of Naples
Warranty Coverage
Workmanship terms stated in writing on the scope, with manufacturer coverage on cabinets and appliances
How a Project Runs

Your Naples Kitchen Remodel in 4 Steps

The same order every time: measure, write it down, build to the named weeks, walk through with the scope in hand.

Measure and Plan the Kitchen

Every wall, window and slider is measured, the plumbing and panel are noted, and a scaled plan is drawn with the layout options that fit the room.

Scope, Selections and Permit

Cabinets, stone, tile, fixtures and lighting are chosen in order and written into the scope with allowances, then the permit is filed with the county or the city.

Demolition Through Cabinets

The old kitchen comes out, rough plumbing and electrical are moved and inspected, and the cabinet boxes are set level in their named week.

Stone, Finish and Walkthrough

Countertops are templated and installed, the backsplash and trim go in, and you walk the finished kitchen with the scope in hand.

Wiping down the countertop at the end of a full kitchen remodel
Where It Works

Ideal Applications for Full Kitchen Remodels

Layout Changes

Removing a soffit or a non-bearing wall to open the kitchen toward the lanai or the dining room.

Island Additions

Replacing a peninsula with a working island that carries seating, storage and a second prep sink.

Older Naples Houses

Homes with original cabinets, aging wiring and tile that need a full reset rather than a refresh.

Seasonal Residences

Remodels timed for the summer months and photographed weekly for owners who are out of state.

Pre-Sale Updates

Kitchens brought current before a listing, with permits closed so the title is clear at closing.

Common Questions

Full Kitchen Remodels — Frequently Asked Questions

What drives the price of a full kitchen remodel in Naples?
Cabinets, countertops and the trades, in roughly that order. Local cost guides put Naples full remodels at about $30,000 to $80,000 depending on cabinet grade, stone and how much plumbing or electrical moves, and Florida per-square-foot figures fall around $100 to $350. Those are market observations, not a quote. The measured plan is what produces the real number for your kitchen, with every allowance written next to the item it covers.
How long will my kitchen be out of service during a full remodel?
A full remodel runs about 4 to 6 weeks on site when the layout stays and about 8 to 12 weeks for a full gut with a layout change, and the kitchen is out of use for most of that stretch. The schedule names the demolition week, the cabinet week, the stone template and install weeks and the finish week before anything starts. A temporary setup with the refrigerator, a microwave and a utility sink is part of the plan, and if you prefer to be away for the loud weeks, the weekly photo update covers what you missed.
In what order should a full kitchen remodel be done?
Plan, scope, permit, then build in trade order. On site that means demolition, framing and rough plumbing and electrical, inspections, drywall, flooring, cabinets, countertop template and install, backsplash, plumbing and electrical trim, then paint and hardware. Cabinets are ordered weeks before demolition so they arrive when the rough work is inspected. Stone cannot be cut until the cabinets are set, which is why the stone week always follows the cabinet week on the schedule.
Does a remodel in a Naples flood zone change what can be done?
It can, once the project is large enough. Under the Florida Building Code, a remodel whose cost reaches 50 percent of the structure's market value counts as a substantial improvement, and electrical systems, appliances and plumbing fixtures replaced as part of it must sit at or above the required flood elevation. Most kitchen remodels stay well under that line, but the plan checks the flood zone and the value before the scope is written so the flood question is answered before the permit is filed.
What are the three most expensive items in a full kitchen remodel?
Cabinetry, countertops and labor, with appliances close behind when a built-in refrigerator or a pro range is on the list. Cabinets alone often take a third or more of the budget, which is why the cabinet allowance on the scope is the first number worth questioning. Stone varies widely by slab, so the scope lists the stone allowance separately and names the slab once you have chosen it, so a change in slab shows up as a visible line on the scope before anything is ordered.
See all FAQs →
Where We Work

Serving Naples & Southwest Florida

Kitchen remodeling for houses, condos and gated communities within about 25 miles of Naples, across Collier and south Lee County.

Get a Full Kitchen Remodels Quote

Tell us about your project and you’ll hear back within one business day.

We’ve got your request!

You’ll hear back within one business day. Need to talk sooner? Call +1 (239) 555-0100.

Ready to See Your Kitchen Measured and Planned?

Request a no-obligation consultation. We will measure the room and talk through layout and materials, and if you go ahead, the project starts with a drawn plan, a written scope and a schedule in weeks.

Request a Consultation
Call Us — +1 (239) 555-0100