Design-Build Kitchens in Naples

Kitchen Remodeling in Naples, Planned to the Week

A measured plan and a written scope with every allowance spelled out before demolition, then a schedule stated in weeks. Condo, HOA and out-of-town projects are managed end to end.

We'll put you in touch with a local contractor.

Written Scope Every Allowance Spelled Out
No-Obligation Consultation A Measured Plan Comes First
Naples and Southwest Florida Collier and South Lee County
Workmanship Terms Stated in Writing on the Scope
The Work

Kitchen Remodeling Services for Naples Homes and Condos

Five kinds of kitchen project, each run on the same measured plan, written scope and schedule in weeks.

Full Kitchen Remodels

Gut remodels for Naples houses, from layout and cabinetry through stone, lighting and permits, run on a written scope and a schedule stated in weeks.

Learn More →

Custom Cabinets and Refacing

New custom cabinetry or refacing of sound existing boxes, with door styles, finishes and hardware chosen for Naples humidity and salt air.

Learn More →

Countertops and Backsplashes

Quartz, quartzite, granite and porcelain slab countertops with matching or contrasting backsplashes, templated, fabricated and installed on a named week.

Learn More →

Condo and HOA Kitchen Remodels

High-rise and gated-community kitchens handled end to end: the association approval packet, building hours, elevator and parking rules, and a schedule the board will sign.

Learn More →

Kitchen and Bath Remodeling

Kitchen and bathroom remodels run as one project: shared trades, one permit set, one schedule in weeks and one point of contact for both rooms.

Learn More →
Finished kitchen with white shaker cabinets, a quartz island and a window over the sink looking onto palms New base cabinet boxes set along two walls of a kitchen during a remodel Kitchen island with a white stone top that runs down one end to the floor, two stools beside it Kitchen stripped for a remodel, one wall open to the studs with capped water lines and a broom in the corner Finished galley kitchen with grey cabinets, white counters and a sliding door to a balcony
Why Naples Kitchen Remodelers

The Plan Is Measured Before the Price Is

The schedule is stated in weeks and every allowance is written down before demolition. The measured plan and the written scope come first, the cabinet, stone and finish weeks are named, and if you spend the summer up north the project is managed and photographed while you are away. Condo and HOA rules are handled as part of the job.

Written Scope, Every Allowance

Before the first demolition day you hold a measured plan and a scope that lists cabinets, stone, tile and fixtures with the allowance beside each. If a selection changes or demolition turns up something the plan could not see, the change is priced in writing and discussed with you before the work goes ahead.

A Schedule Stated in Weeks

The cabinet week, the stone week and the finish week are named before work starts. When a delivery moves, you hear about it before the crew would have arrived.

Managed While You Are Away

Seasonal and out-of-town owners get weekly photo updates and one point of contact, with condo approval packets, building hours and elevator rules handled for them.

Two installers setting an upper cabinet during a kitchen remodel
How a Project Runs

Your Naples Kitchen Remodel in 4 Steps

The same order every time: measure, write it down, build to the named weeks, walk through with the scope in hand.

Consultation and Measure

We meet at the kitchen, measure every wall and opening, note the plumbing and panel, and talk through how you cook and what bothers you about the room.

Plan, Scope and Selections

A scaled plan and a written scope with every allowance follow, then cabinets, stone, tile and fixtures are chosen in order and the permit or association packet is filed.

Build to the Named Weeks

Demolition, rough-in, cabinets, stone and finish each land in their named week. If a delivery moves, you hear first, and remote owners get weekly photos.

Inspect and Walk Through

Final inspections pass, permits are closed, and you walk the finished kitchen against the scope with the workmanship terms in writing.

5 Communities
Served
25 miles
Service Radius
2 Counties
Collier and South Lee

Ready to See Your Kitchen Measured and Planned?

Request a no-obligation consultation. We will measure the room and talk through layout and materials, and if you go ahead, the project starts with a drawn plan, a written scope and a schedule in weeks.

Request a Consultation +1 (239) 555-0100

We'll put you in touch with a local contractor.

Questions Naples Homeowners Ask

Kitchen Remodeling Questions, Answered Plainly

Cost, schedule, Collier County permits, condo approvals and how a project runs while you are away.

Local cost guides put most Naples full kitchen remodels roughly between $30,000 and $80,000, with refreshes such as refacing and new counters running about $15,000 to $30,000, and Florida per-square-foot figures landing around $100 to $350. Where a project falls depends on cabinet grade, stone and how much plumbing or electrical moves. Those are market observations. A measured plan with a written scope gives the real number for your kitchen.
A drawn plan to scale, a scope that lists every item with its allowance, a schedule in weeks, the permit scope, and the workmanship terms in writing. If a quote gives one number with no allowances, you cannot tell what cabinet grade or stone it assumes, and that is where price differences between quotes tend to hide. Ask each firm for its cabinet allowance, its stone allowance and the week stone installs. Compare those, not the headline number.
For a cabinet refacing, new quartz counters, a backsplash and lighting in the existing layout, often yes. For a full gut with new custom cabinets and a layout change, it is below where most Naples projects land. The honest way to find out is a measured plan: the allowances show exactly where $30,000 goes and what has to give. A common choice is to keep the layout and spend on cabinets and stone, which is where the kitchen is actually felt.
Reface if the boxes are plumb, dry and in a layout you want to keep; replace if the layout changes or the boxes have swelled from moisture. Refacing typically costs a fraction of new cabinetry and takes a week or two on site, while new custom cabinets carry a lead time of several weeks. The boxes are inspected first and the recommendation comes with the cost difference beside it, so the decision is yours with both numbers in view.
Plan on roughly two to six weeks for the plan, scope and selections, a few weeks for permits or association approval, and about 2 to 3 weeks on site for a refresh, 4 to 6 weeks for a mid-tier remodel and 8 to 12 weeks for a full gut. Cabinet lead time runs in the background during selections and permitting. The schedule names the demolition, cabinet, stone and finish weeks before work starts, so the planned finish is a stated week you can check progress against.
Where We Work

Serving Naples & Southwest Florida

Kitchen remodeling for houses, condos and gated communities within about 25 miles of Naples, across Collier and south Lee County.

Start With a Measured Plan for Your Naples Kitchen.

Send the form or call during business hours to arrange a no-obligation consultation. We will measure the kitchen and talk through layout and materials, and if you go ahead, the project starts with a written scope and a schedule in weeks.

Call or Text Us +1 (239) 555-0100

We'll put you in touch with a local contractor.

Hours Mon–Fri 8am–5pm · Sat 9am–1pm by appointment

We've got your request!

You’ll hear back within one business day. Need to talk sooner? Call +1 (239) 555-0100.

View full contact page
Call Us — +1 (239) 555-0100